summaryrefslogtreecommitdiff
diff options
context:
space:
mode:
-rw-r--r--TODO.md46
1 files changed, 0 insertions, 46 deletions
diff --git a/TODO.md b/TODO.md
index 8394972..3ab244e 100644
--- a/TODO.md
+++ b/TODO.md
@@ -585,50 +585,4 @@ src/tests/
---
-## Low Priority: Developer Tools & Editors
-
-### Task #57: Interactive Timeline Editor (Gantt Chart Evolution)
-**Goal:** Create a web-based interactive editor for `demo.seq` files based on the existing Gantt chart HTML output.
-
-**Features:**
-- **Load/Save**: Parse and serialize `demo.seq` files
-- **Visual Timeline**: Interactive Gantt-style view of sequences and effects
-- **Drag & Drop**: Move sequences and effects along the timeline
-- **Edit Timing**: Adjust start/end times, priorities
-- **Overlap Detection**: Visual feedback for sequence/effect conflicts
-- **Zoom/Pan**: Navigate long timelines easily
-- **Effect Properties**: Edit constructor arguments inline
-
-**Technical Scope:**
-- Pure HTML/JavaScript tool (no backend needed)
-- Loads `demo.seq` text file via file input
-- Interactive visualization using D3.js or similar
-- Saves modified `demo.seq` back to disk
-- **Does NOT**: Interact with C++ code, preview rendering, compile timeline
-
-**File Structure:**
-```
-tools/timeline_editor/
-├── index.html # Main editor UI
-├── editor.js # Core editing logic
-├── parser.js # demo.seq parser
-├── serializer.js # demo.seq writer
-├── timeline.js # Gantt chart renderer
-└── README.md # Usage instructions
-```
-
-**Use Cases:**
-- Quickly adjust demo timing without recompiling
-- Visualize sequence overlaps and priorities
-- Experiment with different timing arrangements
-- Export modified timeline for integration
-
-**Priority:** Very Low (quality of life improvement, not critical)
-
-**Effort:** 1-2 weeks for basic functionality
-
-**Dependencies:** None (standalone tool)
-
----
-
## Future Goals \ No newline at end of file